Consulting Activities
-
Site Selection for Central Warehouses (A Multi-facility
Location Problem), for Australian Defence Industry, Canberra, Australia,
1998-99.
-
A Plan for Optimum Improvement and Expansion of Planning Management
and Operations of the Production and Maintenance System of
a Pharmaceutical Industry, 1993-96.
-
Design of Plant Layout and Production Lines for a Toiletries Production
Industry, 1994-95.
-
Layout of Various Shops of the Workshop of a School Equipment Producing
Workshop, 1985-86.
-
Study of Inventory Control and Measures to Reduce Stock of Stores and
Cost Including Inventory Control Through Computer System (of a Sugar Mill),
1985-86.
-
Determination of Production Capacity of a Multi-line Steel Re-Rolling
Mills, 1992.
-
Selection of a Site for a Toiletries Industry, 1994.
-
A System Study for Computerisation of Bangladesh Telephone and Telegraph
Board, 1994-95.
-
A Project on Computerised Primary School Teacher Selection Process:
Design and Implementation, 1993.
-
A Project on Computerised Result Processing System for Secondary and
Higher Secondary Levels Public Examinations in Bangladesh: Design
and Implementation, 1993-94.